50ZJH High Pressure Centrifugal Pump for Coal Mining Equipment

FOB Reference Price:Get Latest Price
US $2,600-8,000 / Set | 1 Set/Sets pump for coal plant (Min. Order)
Supply Ability:
500 Set/Sets per Month Mining centrifugal pump
Port:
Tianjin, Qingdao, Ningbo, Shanghai...
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Hebei, China (Mainland)
Brand Name:
Naipu
Model Number:
50ZJH
Theory:
Centrifugal Pump
Structure:
Single-stage Pump
Usage:
Water
Power:
Electric
Standard or Nonstandard:
Standard
Fuel:
Diesel
Pressure:
Low Pressure
Application:
Tailings, Cyclone Feed, Heavy Minerals, Mill Discharge...
OEM:
Acceptable
Certificate:
CE ,SGS, ISO9001
Material:
A05, A07, A49...
Type:
50ZJH-D High Head Slurry Pump
Size:
50 mm
Drive:
V-belt, Direct Coupling
Liner:
Replacement
Construction:
Double Casing
Feature:
Corrosion Resistant
Warranty:
1 Year Warranty(except Wearing Parts)
Packaging & Delivery
Packaging Details
Standard export wooden cases, according to the pumps and customer's request
Delivery Time
Shipped in 15 days after payment

50ZJH High Pressure Centrifugal Pump for Coal Mining Equipment

Product Description

ZJH High Head Slurry Pump Selction

 

Horizontal Slurry Pumps selection according the properities of a slurry. 

 

The volume of slurry to be transported must be reliably determined before defining a slurry pumping application. Wiehout a clear understanding of the volumetric requirement and possible variations of demand, it would be impossible to adequately compute a pumping system solutions.

For slurry pumping, the flow rate is determined by a correlation between three factors:

1) the solids SG,

2) the tonnage of solids required to be pumped,

3) the concentration of these solids within the slurry mixture.

These three factors need to be determined prior to selecting any slurry pump. An example of how the flow rate can be calculated, using these values, is given in select pump type & materials.

 

Static head required

 

The actual vertical height (static head) over which the slurry is to be lifted must also be accurately determined prior to selectiong a pump. This is relatively easy in plant situations, where the vertical heights involved can be measured or obtained from drawings.
In the case of overland pipelines, surveying data is often required to obtain this vital information. Variations in the vertical height (normally measured from the liquid level on the intake side of the pump to the discharge point) can have a major impact on the output of any centrifugal pump.
It is therfore important that this vertical height be determined within reasonable accuracy (0.5m) prior to pump selection.

 

Detailed Images

 

 

Product Construction

1. High Head Slurry Pump Structure Drawing

2. ZJH Slurry Pump Main part Number at the Drawing

032: Frame Plate
110: Volute liner
041:  Frame Plate Liner Insert
124: Volute Cover Seal
122: Stuffing Box Seal


132: Discharge Joint
147: Impeller
013: Cover Plate

083: Throat Bush
060: Intake Joint

3. ZJH Horizontal Slurry Pump Materials of construction

 

LINERS

IMPELLERS

CASING

BASE

EXPELLER

EXPELLER RING

SHAFT SLEEVE

SEALS

Standard

Chrome Alloy

Chrome Alloy

SG Iron

SG Iron

Chrome Alloy
or
SG Iron

Chrome Alloy
or
SG Iron

SG Iron

Rubber

 

 

 

Pump parameters

ZJH Slurry Pump selection chart

( Note: Approximate performance for clear water,to be used for primary selection only.)

 

High Head Slurry Pump Performance Parameters

TypeAllowable Mating Max. Power(Kw)Clear Water PerformanceImpeller
Capacity/Q m³/hrHead/mSpeed/rpmMax Efficiency/%NPSH/mNos of VaneImpeller Diameter/mm
25ZJH3016.2--34.225-921400--2200202--5.55 330
50ZJH6068.4--136.825-87850--1400473-7.55457
75ZJH120126-25212-97600-1400502-55508
100ZJH560324-72030-118600-1000643-85711
150ZJH560468-100820-94500--1000654-125

711

Related Products

We can produce many kinds of centrifugal slurry pump for mining ,sand and other solids slurry transporting.

 

Packaging & Shipping

Packaging details: 1. Outside package: standard export wooden cases. 2. Inner package: Stretch film.

Certifications

CE, SGS, ISO9001 Certification

 

 

Naipu Slurry Pump Models

 

AH(R)

L(R), M

HH

SP(R)

G

AF Series

1.5/1B-AH(R)

20A-L

1.5/1 C-HH

40PV-SP(R)

6/4D-G

2QV-AF

2/1.5B-AH(R)

50B-L(R)

3/2D-HH

65QV-SP(R)

8/6E-G

3QV-AF

3/2C-AH(R)

75C-L

4/3E-HH

100RV-SP(R)

10/8F-G

6SV-AF

4/3C-AH(R)

100 D-L

4/3X-HH

150SV-SP(R)

10/8S-G

8SV-AF

6/4D-AH(R)

150E-L

6/4F-HH

200SV-SP

12/10G-G

 

6/4E-AH(R)

300S-L

6/4X-HH

250TV-SP

14/12G-G

 

8/6E-AH(R)

10/8 R-M

6S-H

 

14/12T-G

 

8/6R-AH(R)

10/8 E-M

8/6S-H

 

16/14 G-G

 

10/8F-AH(R)

 

8/6X-H

 

16/14TU-GH

 

10/8X-AH(R)

 

6S-HP

 

16/14H-GH

 

12/10ST-AH(R)

 

8/6S-HP

 

18/16G-G

 

14/12ST-AH(R)

 

8/6X-HP

 

18/16TU-GH

 

16/14TU-AH(R)

 

 

 

 

 

20/18G(TU)-AH(R)

 

 

 

 

 

 

Horizontal Slurry Pump Pressure Test

FAQ

Q1. How to gurantee the quality?

  A:  All our pump and spare parts pass ISO 9001:2008 and CE certificate.   Warranty time is 12 month except wet end parts.

 

Q2. What information should be known if I want to get a quotation?

 

   A: Pump working conditions, Usage , Pump Capacity, Pump Head , Slurry SG, The More the Better. Please offer me the type of the used pump that working now.

 

 

Q3. Your company product range?

  A: Centrifugal pump, Slurry pump, Sand pump, Gravel pump, Dredging pump, Clean water pump, Sewage pump, Chemical pump, Single stage pump, Double suction pump, Industry pump, Paper pulp pump, Mud pump, Sludge pump, etc

 

Q4. Delivery time:

 

 A: For the Common Slurry pump and spare parts, the delivery time within 7-15 days. Special material and OEM production is longer.